Call: 07855 253 458
or Email save@scenicacoustic.com
Partial Discharge (PD) – Switch Gear Condition Monitoring surveys are performed to monitor the condition of the insulation of the switchboard, cables and ancillary components. The Partial Discharge (PD) surveys, both on and off-line are performed during normal operation utilising Transient Earth Voltage (TEV) and Ultrasound detection techniques and are suitable above 3.3kV.
Scenic Acoustic & Vibration Engineering (SAVE) work in conjunction with subject matter experts in this field to provide the best and most appropriate service.
Website by Furness Media